三葉羅茨風(fēng)機的組裝與試機

三葉羅茨風(fēng)機的組裝與試機鑫魯泉盛環(huán)保設(shè)備有限公司三葉羅茨風(fēng)機整機在出廠之前就已經(jīng)組裝好,在出廠前還需要進行一定的測試,所以,三葉羅茨風(fēng)機出廠前的工作也有很多,今天風(fēng)機就給大家分享一些,關(guān)于組裝與試機的內(nèi)容!

The assembly and testing of Three Leaf Roots blower by Xinlu Quansheng Environmental Protection Equipment Co., Ltd. The entire Three Leaf Roots blower is assembled before leaving the factory, and requires certain testing before leaving the factory. Therefore, there are also many tasks before the Three Leaf Roots blower leaves the factory. Today, we will share some information about assembly and testing of the blower with you!

一、三葉羅茨風(fēng)機如何組裝?針對“組裝”的問題,我們首先要了解組裝的內(nèi)容,三葉羅茨風(fēng)機出廠前的組裝有兩部分內(nèi)容,一分部是機頭的組裝,一部分是整機的組裝,這些是出廠前的組裝;經(jīng)過組裝之后,便可以進行發(fā)貨了,終端客戶在拿到三葉羅茨風(fēng)機之后,還會對羅茨風(fēng)機進行管道與風(fēng)機的連接。

1、 How to assemble a three leaf Roots blower? Regarding the issue of "assembly", we first need to understand the content of assembly. The assembly of the Three Leaf Roots blower before leaving the factory consists of two parts: one is the assembly of the machine head, and the other is the assembly of the entire machine. These are the assembly before leaving the factory; After assembly, it can be shipped, and the end customer will also connect the pipeline to the Roots blower after receiving it.

下面風(fēng)機針對出廠前的風(fēng)機組裝進行詳細的描述:三葉羅茨風(fēng)機安裝的時候需要注意什么問題?

Below is a detailed description of the fan assembly before leaving the factory: What should be paid attention to when installing the Three Leaf Roots blower?

1、機頭安裝

1. Head installation

風(fēng)機的機頭為組裝好的,將組裝好的風(fēng)機機頭安裝在底座的一側(cè),然后使用螺栓進行緊固;

The fan head is assembled, and the assembled fan head is installed on one side of the base, and then fastened with bolts;

2、電機安裝

2. Motor installation

電機安裝在底座的另一側(cè),安裝上去之后,對螺栓稍加緊固,不要立即緊固鎖死;

The motor is installed on the other side of the base. After installation, tighten the bolts slightly and do not immediately tighten and lock them;

3、皮帶輪安裝

3. Belt pulley installation

皮帶輪有兩部分,一個安裝在機頭一側(cè),一個安裝在電機一側(cè),使用專業(yè)設(shè)備,對皮帶輪進行調(diào)整,在裝配時,必須要保證機頭和電機的皮帶輪,在一條縱向線上,不能出現(xiàn)偏差,要調(diào)整到在同一水平面上;

The pulley has two parts, one installed on the side of the machine head and the other on the side of the motor. Professional equipment is used to adjust the pulley. During assembly, it is necessary to ensure that the pulleys of the machine head and the motor are on the same longitudinal line, without deviation, and adjusted to the same horizontal plane;

4、皮帶安裝

4. Belt installation

安裝好皮帶輪之后,然后安裝皮帶;

After installing the pulley, proceed to install the belt;

5、緊固螺栓

5. Tighten bolts

緊固電機的螺栓,同時調(diào)整羅茨風(fēng)機皮帶的松緊度,調(diào)整好之后,然后進行螺栓鎖死緊固;

Tighten the bolts of the motor and adjust the tightness of the Roots blower belt. After adjustment, lock and tighten the bolts;

6、安裝皮帶保護罩

6. Install belt protection cover

上面的安裝完成之后,將皮帶保護罩安裝在底座上面,緊固螺栓即可;

After the installation is completed, install the belt protection cover on the base and tighten the bolts;

7、安裝壓力表安全閥

7. Install pressure gauge safety valve

一般廠家為了保證壓力表安全閥不被損壞,可能不會為我們安裝,有的廠家可能會對此進行安裝;

Generally, manufacturers may not install the pressure gauge safety valve for us to ensure that it is not damaged. Some manufacturers may install it instead;

二、羅茨風(fēng)機試機也有一定的要求,今天鑫魯泉盛風(fēng)機給大家記錄下,我們所需要的試機內(nèi)容:

2、 There are also certain requirements for the testing of Roots blowers. Today, Xinlu Quansheng blower will record the testing content we need:

1、齒端軸承溫度檢測

1. Temperature detection of tooth end bearing

2、驅(qū)端軸承溫度檢測

2. Drive end bearing temperature detection

3、主油箱溫度

3. Main fuel tank temperature

4、副油箱溫度

4. Secondary fuel tank temperature

倉泵倉式泵01

5、機殼溫度

5. Chassis temperature

6、出風(fēng)口溫度

6. Air outlet temperature

7、噪音檢測

7. Noise detection

8、轉(zhuǎn)速檢測

8. Speed detection

9、壓力檢測

9. Pressure detection

10、風(fēng)量檢測

10. Airflow detection

11、軸功率檢測

11. Shaft power detection

12、振動檢測

12. Vibration detection

13、主油箱有、無漏油情況

13. Main fuel tank with or without oil leakage

14、副油箱有、無漏油情況

14. Whether there is oil leakage in the auxiliary fuel tank or not

以上內(nèi)容是鑫魯泉盛環(huán)保風(fēng)機出廠需要檢測的內(nèi)容,我們的風(fēng)機在出廠之前都會進行試機試運行,參數(shù)都會進行登記,有質(zhì)檢部進行核驗,產(chǎn)品質(zhì)量合格之后,方可出廠。

The above content is the testing required for Xinlu Quansheng environmental protection fans before leaving the factory. Our fans undergo trial operation and parameter registration before leaving the factory, and are verified by the quality inspection department. Only after the product quality is qualified can it leave the factory.

如果您采購風(fēng)機時,采購的是我們的鑫魯泉盛環(huán)保的產(chǎn)品,一定會有羅茨風(fēng)機合格證書,如果您采購的不是我們的風(fēng)機,沒有合格證書,那么試機的時候一定要按照使用手冊的說明書,進行操作,避免出現(xiàn)試機問題。

If you purchase a fan from our Xinlu Quansheng Environmental Protection product, you will definitely have a Roots blower certificate of conformity. If you do not purchase a fan from us and do not have a certificate of conformity, you must follow the instructions in the user manual when testing to avoid testing problems.